10 Tph Alluvial Gold Wash Plant In Togo

Introduction

The Togolese project from start company registration fees, office rental, office equipment procurement to establish mining site and start production had only spent 75 days.

 

The first mining area is about 500 kilometers southwest of Lom é. The examination and approval of mining rights has been completed, covering an area of 10 hectares. There is a road through to the mining area. After investigation, the ore area is a typical sedimentary type of late deposit of Shajin. The ore belt is distributed in flat and low-lying areas and extends widely. According to preliminary understanding of the situation, the deposit extension at least more than 50 square kilometers. The gold-bearing layers are distributed between 0.2m-4m and the thickness varies from 0.5m-2m to 0.5m-2m depending on the topography. The gold content is expected to be 0.5g-2g / t.


1-2009221H6104J.jpg


The second mine is 350 km south of Lom é. The nature of the deposit is the same as that of the first ore area. The extension of the ore belt is larger than that of the first mining area. The preliminary estimate is about 80-100 square kilometers. The thickness of the gold-bearing layer is 1m-3 m, and the thickness of the overburden varies with the topography, between the 2m-7m.Mining areas also have river distribution, can supply water for production. The mining area is flat, with the further development in the future, it is necessary to build 8 kilometers of road through the mining area (earth road, bulldozer can push even). The efficiency of road construction is high and the cost is low. There is already a small French miner in this area. Small-scale production is under way.


1-2009221I533295.JPG


The owner has purchased a small capacity 10t/h production line from our company. To carry out production also needs forklift, excavator and other engineering equipment. And complete the installation and construction of the production line. 


Alluvial gold Process in Togo(图7)

1-2009221I425191.JPG

Alluvial gold Process in Togo(图9)


1-2009221I435L1.JPG